SEPTA’s annual Center City Trolley Tunnel maintenance project, aka Trolley Tunnel Blitz, began on Friday night. All trolleys going east will be on diversion to 40th and Market, where passengers can switch to the train, for the duration of the project (until July 23).
A portion of Woodland Avenue, between 39th and Chester, is also closed to all traffic due to this project, which includes track repair work near the trolley portal. Chester Avenue between 41st and Woodland is also closed.
July 19th, 2018 at 1:09 pm
When will the trolley stop restaurant open on the 40th street stop? It was supposed to open March 2018.
July 19th, 2018 at 4:21 pm
Pretty soon I hope. They’ve been hiring staff for a while. Looks like Loco Pez is only a few days off.
July 23rd, 2018 at 9:10 pm
I think the new restaurant building is one of the ugliest things around. Why couldn’t SEPTA have gotten a decent design? This place looks like it was put together out of leftover bits of building supplies!